We got new mock-up yesterday and tested it in the afternoon. The test result seems semi passed because the new design of link-bar and mesh-holder were both validated without problem. There is a new issue, which it changed from previous design, the from wall was deformed. After discussed with customer we propose to change back previous design and move two components backward 1mm. Customer agree with us and we should be able to release drawing for tooling tomorrow.
沒有留言:
張貼留言